"This is an upstairs bathroom in an older home in the Cedar Rapids area. The tile in this bathroom was somewhat difficult to install due to the size and configuration of the room. Notice that the tub has a curved front and approximately 55% of the tiles installed had to be cut. The grout was not yet installed when the pictures were taken."
Note curved tub with special
tile cutout
"New tile in the mud room of a new house installed by HQHM, wood floor installed by another contractor."
Entry from garage - different
elevations
Note smooth transitions
"New tile floors in the
same house showing one community bathroom and one
master bathroom."
Entry from garage - different
elevations
Note smooth transitions
New tile in new home
Woodwork and tile
around fireplace by HQHM
Woodwork and tile around
fireplace by HQHM
Barn Style Garage Demo
Garage Demo Complete
"This bathroom had a major tile failure. The tile failed because moisture was migrating behind the tile and deteriorating the plaster to which the tile was affixed. The owner insisted on keeping the existing wallpaper intact. After the demolition and new installation the owner was pleased that he did not have to repaint or re-wallpaper the bathroom. The shower mixing valve and shower head were also upgraded during this renovation."